§ 4-2-12. Same; within 90 days after notice.  


Latest version.
  • When there is an imminent health hazard, as determined by the public utilities director or the department of health and environmental control, a sewer connection, as required by section 4-2-11, shall be made within 90 days after the furnishing of notice of the availability of the sewer system, which notice may be sent by regular United States mail, addressed to the owner or tenant of the property.

(Ord. No. 2009-05-11(A), 5/11/09)